Examining The Boeing 737 MAX Case Study Case Study

Exclusively available on Available only on IvyPanda® Made by Human No AI

The Boeing 737 MAX initiative exemplifies how rewards can influence the behavior of sophisticated technological and financial systems, resulting in massive difficulties. Boeing’s reputation as a harmless saleable plane manufacturer has been asked questioned as an individual of the greatest renowned corporations in the whole industry of aviation. The Boeing 737 MAX will be examined in terms of engineering ethics and responsible leadership in this case study.

The Boeing 737 is a narrow, fairly small part of the Boeing single-aisle aircraft family that first flew in 1964. After a difficult start, the 737 grows extremely successful, ultimately being the world’s greatest aircraft family. In the smaller airliner category, it subsumes nearly all of its early opponents. The idea is expanded to include a variety of growth variations with varying fuselage stretches. The 737-300, 737-400, and 737-500 are among them. The updated models will be powered by a more potent CFM-56 better combustion turboshaft. The boxes are attached upper and extra front, and the maneuvering thrusters are trampled on the lowermost to allow the bigger width high-bypass locomotives whereas maintaining appropriate ground clearance.

The 737 Subsequent Generation series has the most significant changes, including expanded and remodeled flaps, bigger fuel tanks for increased mobility, new flight controls, and upgraded CFM-56 engines. The 737NG class, which comprises the 737-600, 737-700, 737-800, and 737-900, was introduced in 1996. 737NG models have roughly three times the initial passenger volume, double the ignition power, and satisfy different types of customers than the initial 737 design; but the FAA has certified all of the new versions under the original 737 certificate.

The Airbus A320 line replaces the 737 as the principal challenger. The A320 Neo generation from Airbus features new technology ultra-fuel-efficient engines with greater propeller sizes. To prevent losing succeeding mono airplane sales to Airbus, Boeing plans to develop a new 737 series with engines that are similar in terms of fuel efficiency. The 737 MAX is heavily marketed by Boeing as being similar to earlier 737 models but significantly more cost-effective to handle. It utters that a 737 aeronaut can change to on the wing the 737 MAX by little extra tutoring.

As an elucidation to the aircraft flying characteristics issues, Boeing hides the reality of the MCAS aircraft regulator structure. It is not revised by the FAA as a fragment of the 737 MAX sanction process, it does not tell air transport client technological agents about it, it does not document it in-flight engineer manuals, and neither does it symbolize it in whichever 737 model software for flight teaching. When it comes to 737 MAX certification, the FAA adopts a palm attitude, believing Boeing to efficiently consciously the new plane. The new variations use the approximately 50-year-old hard copy from the initial 737 design.

In less than five months, two 737 MAX planes have crashed, killing all occupants. The MCAS is revealed by the crashes, which are linked to flight control issues that the pilots were unable to resolve. All 737 MAX airplanes have been banned around the universe until their safety can be established. Airline companies that own over 400 737 MAX aircraft are working to find other planes to compensate for the lost volume. They are obliged to reschedule a significant number of commercial airlines and suffer huge losses as a result.

In conclusion, the Boeing 737 MAX aircraft engineers can at some point be termed as unethical, being motivated by financial incentives to produce a product with flaws, severely tarnishing the company’s trustworthiness manufacturer of secure airplanes. Boeing has failed to be honest with state regulators and the flight public by marketing the 737 MAX as demanding no extensive approval assessment and no substantial flight training for the new features of the airplane. At this point, it is unclear when the necessary remedial procedures will be performed to ensure that the 737 MAX plane is fit to continue to normal airline operation.

More related papers Related Essay Examples
Cite This paper
You're welcome to use this sample in your assignment. Be sure to cite it correctly

Reference

IvyPanda. (2022, November 15). Examining The Boeing 737 MAX Case Study. https://ivypanda.com/essays/examining-the-boeing-737-max-case-study/

Work Cited

"Examining The Boeing 737 MAX Case Study." IvyPanda, 15 Nov. 2022, ivypanda.com/essays/examining-the-boeing-737-max-case-study/.

References

IvyPanda. (2022) 'Examining The Boeing 737 MAX Case Study'. 15 November.

References

IvyPanda. 2022. "Examining The Boeing 737 MAX Case Study." November 15, 2022. https://ivypanda.com/essays/examining-the-boeing-737-max-case-study/.

1. IvyPanda. "Examining The Boeing 737 MAX Case Study." November 15, 2022. https://ivypanda.com/essays/examining-the-boeing-737-max-case-study/.


Bibliography


IvyPanda. "Examining The Boeing 737 MAX Case Study." November 15, 2022. https://ivypanda.com/essays/examining-the-boeing-737-max-case-study/.

If, for any reason, you believe that this content should not be published on our website, please request its removal.
Updated:
This academic paper example has been carefully picked, checked and refined by our editorial team.
No AI was involved: only quilified experts contributed.
You are free to use it for the following purposes:
  • To find inspiration for your paper and overcome writer’s block
  • As a source of information (ensure proper referencing)
  • As a template for you assignment
1 / 1