The original Project of the products provided by the company may be divided into three main categories. These are the System Products, which are featured by the main activity of the organization. Module products define the quality and the effectiveness of the organizational activity. Management products are aimed at following and improving the organizational performance of the company and implementing the managerial solutions, particularly those, regarded in the module products.
System Products
The Product Breakdown Structure, based on the principle of dividing the products by their origin, is aimed at highlighting this type of product as the basis of the business activity, and the result of the organizational structure.
Module Products
This type of production is intended to improve the effectiveness of performing the assignments from the “System Products” part of the flow-through improving the managerial practices and creating the necessary business/culture environment.
Management Products
These are the products, implemented b the organizational part of the business hierarchy. Originally, reporting and analyzing, as well as regulating the activity of the allover organization are within the assignments of the executive department in any organization. ADSSC emphasizes the analysis of customer demands and progress reporting as the main concerns of the organization.
Project Flow
The primary task of implementing any project, and developing it, is the definition of the key specifications, its requirements, and particularities of the working environment. After points are defined, and the main goals of the project are stated, it will be developed in two parallel flows: technical and managerial.
Technical entails the purchase of the necessary equipment, elaboration of the controlling and regulation software, and then testing the entire system. The live mode testing is the final stage before the final implementation. It presupposes the backup of the flow to the testing mode if some bugs and drawbacks are found.
The managerial aspect of the project presupposes the thinking over of the policies, that will be regulating the time and attendance system, the encouragement system, and the estimation of the possible requirements and suggestions from the side of the workers. The latter step is of particular importance, as workers will be using this system, and the specifications, based on their requirements should be taken into consideration.