Rehabilitation Centre Expansion Project Management Essay

Exclusively available on Available only on IvyPanda® Made by Human No AI

The Boston University Athletics department at Boston University is an area that warrants further investigation and development for our project. When it first opened its doors in 2005, the BU Fitness and Recreation Center featured an 18,000-square-foot weight and cardio room, an indoor running track, a climbing wall, and two swimming pools. Additionally, there are two summer programs and a juice bar located on the premises. More than 6,500 pupils use their swipe cards to enter the competition arena every day. Skating and ice hockey are two of the activities in the Walter Brown Arena, which is one of the activities that take place.

The group intends to begin by transforming the fitness room on the second floor into a rehabilitation center, which will allow them to begin accepting patients referred from the BU medical school or other affiliated hospitals. In the meantime, the Fitness and Recreation Center frequently holds events such as basketball matches, swim races, private training, and other similar activities, all of which have the potential to inflict injuries or disabilities to participating athletes. These clients are going to be the most important source of revenue for the rehabilitation facility. The facility, however, serves not only as a fitness Centre but also as a multi-purpose complex that welcomes a diverse group of customers, including individuals of all ages and capabilities. In addition to that, the team is planning to install not just one but two electromagnetic elevators in the foyer of the building.

The expansion of the facility will make it easier to divide the area into departments, which will enable smoother transitions and improved service delivery. An extension ensures a clear distinction on where each patient and client needs the service from, thereby minimizing the possibility that confusion will emerge within the facility. There is an increased risk of falling since people living with disabilities make up one of the target groups for the rehabilitation centre. According to the findings of specific studies, close to one-third of all falls can be avoided. The management of a patient’s underlying fall risk factors and optimizing the hospital’s physical architecture and environment are essential components of fall prevention. This toolkit focuses on assisting users in overcoming problems connected with the process of establishing, implementing, and maintaining a culture of patient safety.

A group of people will be responsible for managing the inventory. Their duties will involve performing material handling tasks such as acquiring elevator materials and storing raw components. On the other hand, it is the responsibility of the Human Resource Manager to make sure that the inventory is handled in a manner that is both efficient and economical. The team will establish a suitable lead time and reorder point.

A contact officer will be appointed to find solutions to the problems that have arisen with Agile Elevator enhancers. He will receive all of the assistance that he requires to ensure that the job is finished on time. Concerns about local policy, both positive and negative impacts it will have on the community culture, technology, and serious ecological risks are among the issues the officer addresses. The officer is accountable for a wide range of concerns. Thanks to this change, it will be much simpler to monitor how far along the progress is in the project.

Putting the Columns in Their Correct Places. The technician will first inspect where the lift will be installed to verify its suitability for the work. If necessary, they will provide various alternatives. There must be enough space to work safely without interfering with the flow of other operations, such as ice hockey and skating. When the lift system is completely loaded, the flooring on both levels must be strong enough to hold it. Furthermore, they will inspect to ensure sufficient overhead clearance for loading and unloading the items and people. Bolts will subsequently be used to secure the guiding columns and the columns themselves.

The communication system offers a way by which the athlete officials can relay critical situations involving athletes to medical specialists who might be present in an elevator at the same time. Innovators will soon install audio and video cameras inside the elevators to facilitate more effective communication between the various fitness and rehabilitation departments (Bergmann & Karwowski, 2018). It is done to boost the overall productivity of the rehabilitation center and the community as a whole. They are adopting the usage of biometric scanners to register and recognize people as they visit the facility, assessing whether or not the community has a favorable impression of the establishment.

Automated pharmacy and drug distribution system: It is pre-programmed with prescriptions for individual patients, particularly those suffering from substance addiction, the elderly, and those with mobility disabilities, whom the centre’s registration number can identify. This system also distributes medications. Additionally, the distribution of pharmaceuticals is handled by this system that receives commands from pharmacy control room. It makes administering medication easier, but it also helps save time during the process.

Reference

Bergmann, T., & Karwowski, W. (2018). Advances in Intelligent Systems and Computing, 405–414. Web.

More related papers Related Essay Examples
Cite This paper
You're welcome to use this sample in your assignment. Be sure to cite it correctly

Reference

IvyPanda. (2023, September 28). Rehabilitation Centre Expansion Project Management. https://ivypanda.com/essays/rehabilitation-centre-expansion-project-management/

Work Cited

"Rehabilitation Centre Expansion Project Management." IvyPanda, 28 Sept. 2023, ivypanda.com/essays/rehabilitation-centre-expansion-project-management/.

References

IvyPanda. (2023) 'Rehabilitation Centre Expansion Project Management'. 28 September.

References

IvyPanda. 2023. "Rehabilitation Centre Expansion Project Management." September 28, 2023. https://ivypanda.com/essays/rehabilitation-centre-expansion-project-management/.

1. IvyPanda. "Rehabilitation Centre Expansion Project Management." September 28, 2023. https://ivypanda.com/essays/rehabilitation-centre-expansion-project-management/.


Bibliography


IvyPanda. "Rehabilitation Centre Expansion Project Management." September 28, 2023. https://ivypanda.com/essays/rehabilitation-centre-expansion-project-management/.

If, for any reason, you believe that this content should not be published on our website, please request its removal.
Updated:
This academic paper example has been carefully picked, checked and refined by our editorial team.
No AI was involved: only quilified experts contributed.
You are free to use it for the following purposes:
  • To find inspiration for your paper and overcome writer’s block
  • As a source of information (ensure proper referencing)
  • As a template for you assignment
Privacy Settings

IvyPanda uses cookies and similar technologies to enhance your experience, enabling functionalities such as:

  • Basic site functions
  • Ensuring secure, safe transactions
  • Secure account login
  • Remembering account, browser, and regional preferences
  • Remembering privacy and security settings
  • Analyzing site traffic and usage
  • Personalized search, content, and recommendations
  • Displaying relevant, targeted ads on and off IvyPanda

Please refer to IvyPanda's Cookies Policy and Privacy Policy for detailed information.

Required Cookies & Technologies
Always active

Certain technologies we use are essential for critical functions such as security and site integrity, account authentication, security and privacy preferences, internal site usage and maintenance data, and ensuring the site operates correctly for browsing and transactions.

Site Customization

Cookies and similar technologies are used to enhance your experience by:

  • Remembering general and regional preferences
  • Personalizing content, search, recommendations, and offers

Some functions, such as personalized recommendations, account preferences, or localization, may not work correctly without these technologies. For more details, please refer to IvyPanda's Cookies Policy.

Personalized Advertising

To enable personalized advertising (such as interest-based ads), we may share your data with our marketing and advertising partners using cookies and other technologies. These partners may have their own information collected about you. Turning off the personalized advertising setting won't stop you from seeing IvyPanda ads, but it may make the ads you see less relevant or more repetitive.

Personalized advertising may be considered a "sale" or "sharing" of the information under California and other state privacy laws, and you may have the right to opt out. Turning off personalized advertising allows you to exercise your right to opt out. Learn more in IvyPanda's Cookies Policy and Privacy Policy.

1 / 1