Salinity Control System Design Research Paper

Exclusively available on Available only on IvyPanda® Written by Human No AI

Abstract

This main objective of this project is to design the salinity control system. This report describes the main steps taken by the team and the peculiarities of the new application. This system will be based on the relationship between the voltage and concentration of salt in the liquid.

This development of this application involved the use of the LabVIEW program which was important for describing the main variables. With the help of this program, it was possible to develop the formula and equations that will be important for the functioning of the control system.

This report will also present the discussion of the teamwork during this project and the preparation for the presentation. These are the main questions that should be examined in more detail.

Introduction

This project is aimed at developing a salinity control system. One can say that this task was motivated by several factors.

First of all, in the course of this project, team members had an opportunity to design an application that can be used for various practical purposes. For example, this technology can help those people who examine various solutes.

Moreover, the participants could apply their theoretical knowledge while doing various practical tasks that are related to chemistry, physics, and mechanics. This is the main rationale for this group assignment.

One can say that problem-solving played an important role since the team members had to do various technical and theoretical tasks.

This is one of the main points that can be made. It was necessary to take several steps. In particular, the team members had to determine the relationship between saline and voltage.

Furthermore, it was important to develop a formula that can accurately describe the relationship between these variables. Based on these results, the team could design a subprogram that can control the level of salinity.

These are the main tasks that had to be done. It should be mentioned that this project involved the use of the LabVIEW program which was necessary for many calculations and the development of equations.

Three students took part in this project, and every member of the team took part in data-gathering, discussions, and the design of the control system. These are the main activities involved in this project.

Overall, one can say that this project proved to be both challenging and interesting. Moreover, the team was able to attain the objectives that were set at the very beginning.

Main Body: the development of the control system

As it has been said before, the goal of this project was to design a salinity control system. However, at first, it was important to understand how various variables are related to one another, for instance, one can mention flow rate, the concentration of salt, and voltage.

These indicators play an important role in the design of this technology. Thus, we had to gather data about these indicators. Based on the research, it was possible to develop a mechanism that can regulate the concentration of salt in the liquid.

The project involved the use of National Instruments Labview Software which was extremely useful for identification of the formulas and equations that can describe the relationship between variables.

In turn, these equations can later be used for the development of the specific control system. These are some of the main aspects that can be identified. Apart from that, it is vital to mention the use of LabVIEW program.

This software application helped the team to determine the relationship between voltages and the concentration of salt. Apart from that, one can say that this application enabled the team to work out an algorithm which explains the functioning of the new application.

On the whole, one can say that the LabVIEW program was of great benefit to us since it helped us save both time and effort. This is one of the main arguments that can be put forward. As team members, we worked on other projects before, and we chose to work together on this assignment.

This form of cooperation was very convenient to use because we knew one another, and we could combine our skills. This is one of the factors that contributed to the effective work of the team.

We had to take several important steps. First of all, it was necessary to develop a Gantt chart that illustrates the schedule of the project and describes the work breakdown structure. This activity was vital for the productive work of the team, especially the monitoring of the progress.

This is why this step was critical. Additionally, the team held several discussions during which we examined the main components and functioning of the salinity control system. During these sessions, we tried to find the most effective approach to the design of the system.

In the course of this project, we took several steps that were essential for the completion of the project. For instance, much attention had to be paid to data gathering; during this stage, we needed to study the correlation between different salines and voltages.

These indicators were critical for the development of the control system. Thus, we had to spend a significant amount of time to graph this relationship and develop the formula. Apart from that, the team had to make a calibration that uses Data Acquisition Software or DAQ.

The PowerPoint presentation developed for this project reflects the scope of the project, the description of the salinity control system and its functioning. It is important for the visual representation of the future control system.

Apart from that, there were several challenges that the team had to overcome. The main issue was to develop a logarithmic equation of saline which is a function of voltage.

Moreover, we had to spend much time on integrating the components of this system, especially its software and hardware elements. These are the main stumbling blocks that had to be overcome.

Still, we were able to cope with these stumbling blocks. In turn, the most positive aspect is the ability of the team to coordinate the efforts of the participants. Moreover, we could avoid delays, and each participant could make a significant contribution. These are the main positive aspects.

The designed system includes such elements as a cylindrical acrylic plastic tank and magnetic stirring system. It will be possible to control the levels of salinity with the help of a gear pump. This technology will be based on the relationship between voltage and the concentration of salt.

This relationship between these variables will be at the core of this system. The control function will be based on the use of subprogram which will manipulate the concentration of salt in the liquid.

These are the main aspects that can be identified. Overall, this control system can be a useful tool for regulating the concentration of salts in the liquid, and it can be of great use to various professionals.

Conclusion

Overall, this project has demonstrated that the team should pay close attention to various aspects. In particular, one should focus on the ability of team members to incorporate hardware and software into a single entity.

The most important to the task is to ensure that the hardware functions according to the algorithm which we developed for this project. Apart from that, it will be necessary to focus on the interactions with contractors and other engineers.

We will need to explain the main functional characteristics of the control system and its peculiarities. It is important to monitor the performance of third-parties that could be involved in this project.

On the whole, the interaction will be important for the proper development of the salinity control system. While working with subcontractors, we should develop timelines and measurable goals according to which the control system can be evaluated.

By addressing these challenges, we can avoid many pitfalls. Apart from that, this project can be based on the work of several teams such as engineers and software designers. Thus, it will be vital to coordinate the efforts of subcontractors and engineers.

These are the main aspects that can be identified. Overall, this project demonstrates that the development of technologies requires the knowledge of different disciplines that can be related to applied science and management. This is one of the main issues that should be considered.

More related papers Related Essay Examples
Cite This paper
You're welcome to use this sample in your assignment. Be sure to cite it correctly

Reference

IvyPanda. (2020, March 15). Salinity Control System Design. https://ivypanda.com/essays/salinity-control-system/

Work Cited

"Salinity Control System Design." IvyPanda, 15 Mar. 2020, ivypanda.com/essays/salinity-control-system/.

References

IvyPanda. (2020) 'Salinity Control System Design'. 15 March.

References

IvyPanda. 2020. "Salinity Control System Design." March 15, 2020. https://ivypanda.com/essays/salinity-control-system/.

1. IvyPanda. "Salinity Control System Design." March 15, 2020. https://ivypanda.com/essays/salinity-control-system/.


Bibliography


IvyPanda. "Salinity Control System Design." March 15, 2020. https://ivypanda.com/essays/salinity-control-system/.

If, for any reason, you believe that this content should not be published on our website, please request its removal.
Updated:
This academic paper example has been carefully picked, checked and refined by our editorial team.
No AI was involved: only quilified experts contributed.
You are free to use it for the following purposes:
  • To find inspiration for your paper and overcome writer’s block
  • As a source of information (ensure proper referencing)
  • As a template for you assignment
1 / 1